Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Jan 07, 2021     Brake Lines - (8 hours)       Category: Landing Gear
The "upgrade" brake line kit comes with the lines having a tunnel at the back of landing gear. I like the protection it affords the line and looks nice. The only thing is that as the line comes up the gear it terminates at a place that doesn't allow access to the fuselage. I consulted other build logs and referenced some photos I took while at Torrance. I opted for what Torrance did.

This required drilling an access hole that would be just below the floor boards of the rear seat. I also required removal of about 50mm of material from the back of each landing gear to allow the brake line to make the turn.


 